Kaip sumontuoti portalinį kraną?
Gantry crane is widely used for lifting, loading and unloading of machinery and equipment, mainly in some open field of construction. Installation is the first procedure before putting gantry crane into use. And it’s very important for users to get more value from this equipment. Installation workers should follow correct installation instruction. Hidden safety hazards caused by wrong installation should be avoided during installation.
Three Stips
- Gantry crane installation preparation: First of all,installation site should be cleaned up to avoid parts damage during transportation. After allparts in position, check the parts and mark them well. Installation tools also need to be prepared and placed in safe and convenient locations.
- Gantry crane installationprocedure: First,main girder is hoisted in place according to installation instructions. Then assemble the big wheel box on the track of the big car, find the diagonal position and fix it well. With help of crane, leg and wheel box of gantry crane are installed and connected with fasteners. Then install the other leg in same way. Make two side legs are perpendicular to the ground to ensure accuracy of size.
- Tightenmain girder andsupporting legs with help of truck crane. It is not allowed for the truck crane to loosen and unload before main girder is tightened properly. Firmly install connection frame of equipment, install the lifting trolley on trolley track with help of truck crane, adjust the clearance to best state, fasten all accessories in place, and lay down electrical facilities. After installation, safety test should be carried out, and quality inspection department can check and accept qualified records before putting them into normal work.
Pavadinimas, SEVENCRANE, reiškia, kad mūsų kranų įranga dirbs už jus septynias dienas kiekvieną savaitę. Vis daugiau įmonių gamykloje pristato SEVEN kraną, kad galėtų dirbti joms. Vis daugiau įmonių dirba su SEVENCRANE siekti geresnio verslo.