The stamping workshop can be regarded as the heart of an automobile manufacturing plant. And its production efficiency is extremely critical to the production capacity of the entire automobile factory. SEVENCRANE provides numerous high-performance material handling solutions for stamping workshops in numerous automotive manufacturing factories around the world.

85t mostový jeřáb

The stamping workshop needs to produce millions of body parts every day. And the fastest speed and highest efficiency are the core requirements of its production process. Any shutdown means a waste of production time. Therefore, stamping molds need to be replaced in a timely manner according to the production plan. The higher the frequency of replacement, the more interference it will have on the production process. The diversification of car models has significantly increased the number of components that require stamping. This also increases the frequency of mold replacement required during the stamping process. In order to quickly transport the mold to the designated location, SEVENJEŘÁB can customize lifting equipment for double beam bridge crane according to specific applications.

50t-bridge-crane-price

The intelligent sensors of the lifting device and the positioning system controlled by the program can ensure that the mold is automatically grabbed and released from the stamping line and storage area. No additional operators are required for auxiliary operations. The active anti shake system can ensure the smoothness and reliability of the mold handling process. With these functions and systems, the double beam bridge crane can greatly reduce the time for mold replacement. Thereby reducing downtime and improving production efficiency.

The lifting device is usually connected to four non-standard designed fixed pulleys. The four fixed pulleys are all double wound ropes to minimize the wear of the steel wire rope. If necessary, the clamp can also be removed from the lifting device. Replace with hooks connected to the four fixed pulley blocks, allowing the crane to lift other components during press stamping operations. According to actual needs, the lifting device can also be designed as a rotatable fixture to place the mold at multiple angles.